Fallout 4 Anniversary Edition is the latest in a long line of impressive ports to land on Switch 2
Fallout 4: Anniversary Edition is now available on the Nintendo Switch 2, offering a notable improvement over the previous Skyrim port.
S4 to Fürstenfeldbruck: Greens discuss S-Bahn expansion
The Greens in Fürstenfeldbruck are holding a panel discussion to address delays in the expansion of S-Bahn Line 4, which has been postponed to 2040 according to a recent MVV position paper.
How many light bulbs does the new Uruguay station of subway line B have: the curious fact and how they will prevent them from being stolen
The reopened Uruguay station on Buenos Aires' subway line B features over 4,000 LED light bulbs as part of its artistic renovation.
Here is the correct Eurojackpot line
The Eurojackpot draw on Tuesday evening had no full wins, with the correct line being 4, 5, 26, 38, and 48, and the jackpot for the next draw is approximately €73 million.
Train travel in Záhorie will be 10 to 12 minutes faster, but not until 4 to 5 years from now
Modernization works on a busy railway line in Slovakia's Záhorie region are expected to improve travel time by 10 to 12 minutes, with completion anticipated by 2027.
Extension construction of the 7th tram line in Riga reallocates 1.4 million euros
The Latvian government has decided to reallocate 1.374 million euros for the extension of the 7th tram line in Riga, raising the total project budget to 29.449 million euros.
The Bergen Line became a Christmas movie: Watched by millions
Over 2.1 million Brits watched a documentary on the Bergen Line, which highlighted the stunning Norwegian landscape and culture.
Athens Metro - Line 4: The excavator appeared in Evangelismos - The tunnel from Katechaki has been completed (images)
The 'Athena' tunnel boring machine reached the Evangelismos shaft, having completed a 5.1-kilometer stretch for Athens' new Metro Line 4.
Metro Line 4: The tunnel from Goudi to Evangelismos has been completed
The tunnel for Athens Metro's Line 4 has been successfully completed, marking a significant milestone in the city's transportation infrastructure.
AVAX: A Breath Away from Completion of the Katechaki - Evangelismos Tunnel
One of the two tunnel boring machines constructing Athens Metro Line 4 is nearing its destination at the Evangelismos shaft.
Metro: Unknown delivery time for line 4
The completion date for Athens Metro Line 4 remains uncertain despite progress in tunnel construction due to delays in preliminary works for stations.
Changes to the Red Metro Line: 4 stations will close earlier, detailed schedules
Four stations on Athens' Red Metro Line will be closing earlier due to ongoing maintenance work.
Racing vs Argentinos Juniors, LIVE: what time is the match, probable line-ups and how to watch date 4 of the Apertura Tournament
Racing seeks redemption after three consecutive losses as they prepare to face Argentinos Juniors in the 4th round of the Apertura Tournament.
Mali: Dozo hunters on the front line against jihadists of Jnim in Bandiagara
In Mali, the jihadists of Jnim carried out a deadly attack on February 4, 2026, targeting a position of Dan Na Ambassagou, a group of traditional dozo hunters that serve as a defense against jihadists.
A popular cruise line unexpectedly closes and cancels all its trips permanently
Alaskan Dream Cruises has announced the permanent cessation of its operations and cancellation of all scheduled trips in Alaska as of February 4.
Real Estate: The Metro Boosts Prices – In Which Areas
Properties near Metro stations in Attica are experiencing rising interest and prices due to improved accessibility from the new Line 4 project.
Partial collapse of Cuba's electrical system: 3.4 million people are left without power
Cuba's national electric system experienced a partial collapse affecting approximately 3.4 million people across four eastern provinces due to a failure in a high-voltage line.
The break of a pipe cuts off the M-14 road and line 8 of Metro, which provide access to terminal 4 of Madrid Barajas airport
A broken pipe in Madrid has flooded the access tunnel to Terminal 4 of Adolfo Suárez-Madrid Barajas airport, cutting off both M-14 road and line 8 of the Metro.
New morning of chaos on the C-4 commuter line due to a breakdown during construction phase
Disruptions on the C-4 commuter line between Parla and Getafe Sector 3 have left many travelers without trains during rush hour in southern Madrid.
The mobile line registry adds almost 6.5 million users in less than a month
In less than a month since the mandatory mobile line registry took effect, the national registry has recorded over 6.4 million entries, aimed at reducing crimes such as fraud and extortion.
Tesco adds 4 new items to meal deal line-up and shoppers are divided
Tesco has introduced four new limited edition items to its meal deal selection, sparking mixed reactions among shoppers.