Feb 6 • 21:32 UTC 🇧🇷 Brazil G1 (PT)

Cedae completes repair on Guandu pipeline and begins gradual resumption of the system

Cedae has completed emergency repairs on a ruptured pipeline at the Guandu Water Treatment Station and has begun the gradual resumption of the water supply system.

📡 Similar Coverage