Feb 26 • 20:23 UTC 🇬🇷 Greece To Vima

OESE: The damage due to sabotage has been fully repaired to the telecommunications and signaling cables

The Greek railway organization OSE has fully repaired sabotage damage to its telecommunications and signaling cables affected by vandalism incidents.

The Greek railway organization, OSE, announced that the damage caused by acts of sabotage on its telecommunications and signaling cables has been fully repaired. The incident, which took place the previous afternoon between the Plathea and Aiginio stations, prompted an immediate response from OSE's technical team. After identifying the malfunction, the team discovered that the damage was due to intentional acts against the cable installations of the network.

Specialized repair teams from OSE worked intensively to restore the damage. Following the completion of repair work and the necessary safety checks, the telecommunications and signaling systems have returned to normal operation. This quick restoration is important for maintaining safety and reliability across the railway system, which is vital for public transportation.

Lastly, OSE emphasized that it is cooperating with the appropriate authorities to investigate the incident further. Understanding the motivations and identity of the individuals responsible for this act of sabotage is crucial for preventing future occurrences and ensuring the security of national infrastructure.

📡 Similar Coverage