Mar 7 โ€ข 11:47 UTC ๐Ÿ‡ง๐Ÿ‡ท Brazil G1 (PT)

Intersection in Downtown Mogi das Cruzes to be completely closed this Sunday for construction

The intersection between Avenida Governador Adhemar de Barros and Rua Presidente Campos Salles in Downtown Mogi das Cruzes will be fully closed this Sunday for repairs following a road issue.

The intersection between Avenida Governador Adhemar de Barros and Rua Presidente Campos Salles in Downtown Mogi das Cruzes will be fully closed starting at 8 AM on Sunday due to necessary repair work. This decision follows a partial closure that has been in effect since last Monday when a hole surfaced due to the breaking of a visitation well. The local government intends to ensure traffic safety and manage local transit effectively by undertaking this work.

According to the Mogi das Cruzes administration, the repair work is preventive in nature and aims to maintain road safety in the area, with the expectation of completing the intervention on the same day. The repair process involves digging to a depth of approximately 4 meters to identify the issue, followed by installing metallic shoring for worker safety before the visitation well is either repaired or reconstructed. Finally, the hole will be filled, and the asphalt will be restored.

In light of the road closure, the city is providing alternative routes for drivers to minimize traffic disruption. The city government is actively working to communicate these changes to local residents and drivers who might be affected, underscoring the importance of safety and efficient traffic management in the urban area.

๐Ÿ“ก Similar Coverage