Aerovía operates normally after restoration of electricity supply
The Aerovía system in Guayaquil has resumed normal operations following the restoration of electricity by the National Corporation of Electricity (CNEL).
The Municipal Transit Agency (ATM) announced that the Aerovía system in Guayaquil is now operating normally after the National Corporation of Electricity (CNEL) restored power. The system had suspended its services due to technical issues caused by an electricity outage on March 4, which prevented the service from starting operations.
In the wake of the outage, Aerovía undertook technical checks to ensure that the system was functioning correctly. The ATM provided information through a press release, assuring users that these checks were performed to guarantee safe transportation for passengers. The swift restoration of power and subsequent checks reflect the agency's commitment to maintaining reliable and safe transit options for the residents of Guayaquil.
The return to normal operations is significant, as the Aerovía serves as an essential transit solution in the city, and disruptions can greatly affect daily commuters. With the restoration of service and the assurance of safety protocols, residents can now rely on the Aerovía for their transportation needs without concerns over power outages impacting their travel.