Feb 23 • 12:09 UTC 🇧🇷 Brazil G1 (PT)

Bragança initiates task force to eliminate loose wires and organize urban wiring

Bragança Paulista is commencing a task force to address the visual and safety issues caused by loose wires on utility poles, with an organized cleaning event scheduled for March 8 and 9.

In Bragança Paulista, a major initiative is underway to tackle the problems presented by loose and tangled wires on utility poles that pose both visual and safety hazards. This effort, led by the local government, aims to regularize the urban wiring in collaboration with energy, telecommunications, and internet companies. A community cleaning and organizing event, termed the 'Day D', is slated for March 8 and 9, focusing initially on the area around Praça José Bonifácio.

The action plan introduced includes significant measures that mandate the participating companies to take responsibility for maintaining their cabling. Following inspections from the Municipal Procon and the Department of Legal Affairs, companies are required to address any wiring issues promptly. Key aspects of the plan consist of the immediate identification and removal of obsolete or unlabeled cables, ensuring that all wiring does not pose a threat to pedestrians and vehicles, and systematically expanding these services beyond the initial area.

This initiative is not only about improving the appearance of the urban landscape but also plays a crucial role in public safety. By properly maintaining and organizing the wiring throughout the city, Bragança aims to enhance infrastructure usability and aesthetics while reducing potential hazards associated with loose wires. As the work progresses to other regions following the initial clean-up, the city demonstrates its commitment to improving urban living conditions for all residents.

📡 Similar Coverage